The East Group
Home
About Us
Our Services
Market Sectors
Alliance Partners
Career Opportunities

    Office Addresses
324 Evans Street
Greenville, NC 27858
Phone: 252.758.3746
Toll Free: 866.758.3746
Fax: 252.830.3954

2300 Rexwoods Drive
Suite 300
Raleigh, NC 27607
Phone: 919.784.9330
Fax: 919.784.9331

PrintableContact
Industrial
Civil Engineering & Surveying Architecture & Engineering Process & Facilities Technical Staffing

Absorption Chiller & Cooling Tower

Client:   Pharmaceutical Company
Project: This project involved the installation of a new 1500 ton steam absorption chiller system to replace an existing 800 ton electric chiller. The project also included installation of a new cooling tower and concrete basin, piping, a new pipe bridge, and a new tower pump and basin, which was connected to the existing tower basin.

The chiller was installed inside the existing plant. Modifications to the plant included installation of a new steel framed storage mezzanine over the new chiller, installation of numerous wall penetrations for louvers, piping, a new monorail hoist, and many others.
Services
Provided:
Electrical Engineering, Mechanical Engineering
<< Previous Project   |   Next Project >>
 



Contact | About Us | Services | Market Sectors | Alliance Partners | Careers
Copyright © 2007 The East Group, All rights reserved.