The East Group
Home
About Us
Our Services
Market Sectors
Alliance Partners
Career Opportunities

    Office Addresses
324 Evans Street
Greenville, NC 27858
Phone: 252.758.3746
Toll Free: 866.758.3746
Fax: 252.830.3954

2300 Rexwoods Drive
Suite 300
Raleigh, NC 27607
Phone: 919.784.9330
Fax: 919.784.9331

PrintableContact
Industrial
Civil Engineering & Surveying Architecture & Engineering Process & Facilities Technical Staffing

SVP WFI Chiller

Client:   Pharmaceutical Company
Project: The East Group provided design services for a new 800-ton electric chiller to support a new WFI system. The design required the relocation of three existing compressed air dryers to provide room for the new chiller. Installation of a new cooling tower with pump and concrete basin, piping, and pipe bridge modifications were also necessary.

Other modifications included changes to existing catwalks, chilled water loop, and the installation of a new air separator and platform.
Services
Provided:
Electrical Engineering, Mechanical Engineering, Structural Engineering
<< Previous Project   |   Next Project >>
 



Contact | About Us | Services | Market Sectors | Alliance Partners | Careers
Copyright © 2007 The East Group, All rights reserved.